Contractor Will Redo Off-Center Lines on Muncie Street

It will be a do-over for a contractor who has to fix some striping on a downtown Muncie street. Officials say the lines on a stretch of West Charles Street are too far to one side, making the eastbound side extremely tight when on-street parking is taken into account. Already the double yellow line there has been covered over in preparation for repainting so more vehicles can fit in those eastbound lanes.

Previous Post
Pence Touts “Wonderful Team” for Transition
Next Post
Boil Water Order in Place Until 10pm Tuesday

Search this site

Woof Boom Radio

WLBC (104.1 FM, and WLBC HD1), Muncie
WERK (104.9 FM), Muncie
WMUN (92.5 FM, 1340 AM), Muncie
WHBU (101.1 FM & 1240 AM), Anderson
WMXQ (93.5 FM), Hartford City
WBKQ (96.7 FM & 102.9 FM
& WLBC HD2), Alexandria / Muncie

WLBC
WMUN
Blake FM
WERK
MAX Rocks
MuncieJournal
765 Business Journal
WHBU
Woof Boom